{"version":"1.0","provider_name":"da.news","provider_url":"https:\/\/da.news\/en\/","title":"Darmstadt Rhine Road Bridge remains on schedule - da.news","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"0cva79PVe9\"><a href=\"https:\/\/da.news\/en\/rheinstrasse-bridge-darmstadt-timetable-2029\/\">Darmstadt Rhine Road Bridge project remains on schedule<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/da.news\/en\/rheinstrasse-bridge-darmstadt-timetable-2029\/embed\/#?secret=0cva79PVe9\" width=\"600\" height=\"338\" title=\"&amp;quot;Rhine road bridge Darmstadt remains on schedule&amp;quot; &#x2013; da.news\" data-secret=\"0cva79PVe9\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script type=\"text\/javascript\">\n\/* <![CDATA[ *\/\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/da.news\/wp-includes\/js\/wp-embed.min.js\n\/* ]]> *\/\n<\/script>\n","thumbnail_width":2560,"thumbnail_height":1707,"description":"City Confirms: Rail Postponement Has No Impact on Completion Date Despite Deutsche Bahn's announced three-year postponement of the comprehensive renovation of the Frankfurt-Heidelberg railway line, the completion date for the new Rheinstra\u00dfe bridge in Darmstadt remains unchanged. This was announced by Head of Mobility Paul Georg Wandrey. \"My decision to plan the Rheinstra\u00dfe bridge 'anew' and thereby minimize dependencies on Deutsche Bahn as much as possible is now paying off,\" Wandrey explained. The railway's comprehensive renovation was originally scheduled for 2027 but has now been postponed to a later date. Alternative Closure Planned Early As early as December 2023, the City of Darmstadt adjusted the project and requested an additional closure from Deutsche Bahn for a potential demolition of the existing bridge. This alternative timeframe is in the first quarter of 2028 and, according to Wandrey, is already recorded in Deutsche Bahn's internal system. Final approval is still pending but expected. Project continues as planned. \u201cThe planning and tendering process for the bridge construction project is proceeding as scheduled \u2013 regardless of the changes made by the railway company,\u201d emphasizes Wandrey. The necessary track closures for the bridge construction are also currently undergoing the approval process with the railway company and are being continuously updated. The contracted engineering firm is responsible for ensuring that the required track closures are adhered to so that the new Rhine Road Bridge can be put into operation for the tram system as planned by 2029. Wandrey adds: \u201cAlthough the postponement of the railway work reduces the buffer times, the planned completion date is not at risk thanks to early planning.\u201d (DARMSTADT \u2013 RED\/PSD\/stip)"}