{"version":"1.0","provider_name":"da.news","provider_url":"https:\/\/da.news\/en\/","title":"Topping-out ceremony for the expansion of the Arheilgen district school - da.news","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"dGKp5H4O7F\"><a href=\"https:\/\/da.news\/en\/topping-out-ceremony-for-the-extension-of-the-arheilgen-district-school\/\">Topping-out ceremony for the extension of the Arheilgen district school<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/da.news\/en\/topping-out-ceremony-for-the-extension-of-the-arheilgen-district-school\/embed\/#?secret=dGKp5H4O7F\" width=\"600\" height=\"338\" title=\"&amp;quot;Topping-out ceremony for the expansion of the Arheilgen district school&amp;quot; &#x2013; da.news\" data-secret=\"dGKp5H4O7F\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script type=\"text\/javascript\">\n\/* <![CDATA[ *\/\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/da.news\/wp-includes\/js\/wp-embed.min.js\n\/* ]]> *\/\n<\/script>\n","thumbnail_width":1593,"thumbnail_height":924,"description":"Buildings B and C are being modernized and expanded. The topping-out ceremony for buildings B and C at the Arheilgen district school was celebrated on Wednesday (May 27). City Treasurer Andr\u00e9 Schellenberg and School Superintendent Holger Kl\u00f6tzner attended the event together with the school community. The two classroom buildings are currently undergoing comprehensive renovation, modernization, and expansion. The goal is to expand the school from four to five classes per grade and adapt it to current pedagogical and technical requirements. More space for a growing school. Buildings B and C date from the late 1960s and were considered in need of renovation due to their structural condition. Other parts of the school campus have already been modernized in recent years. For example, building D, with a cafeteria and specialist classroom wing, was built in 2012, while the main building A was completely renovated in 2015. The new spatial concept was developed jointly by the school and the school board. The internal structure is based on the pedagogical concept of so-called learning clusters, which are intended to enable modern and flexible learning. Modern facilities and improved accessibility: In addition to the expansion, the buildings are also being adapted to current requirements. These include measures for climate protection, accessibility, fire safety, and state-of-the-art technical equipment. \"With the expansion and renovation of the two buildings, IDA is addressing the modern technical and pedagogical requirements of the growing Arheilgen district school,\" explains City Treasurer Andr\u00e9 Schellenberg. School Superintendent Holger Kl\u00f6tzner adds: \"Once completed, the entire modernized and expanded school grounds will offer a diverse range of options to meet all needs during lessons and breaks.\" Cooperative comprehensive school with a wide range of offerings: The Arheilgen district school is a cooperative comprehensive school for lower secondary education with a preparatory level as well as lower secondary, intermediate secondary, and upper secondary tracks. It also offers intensive classes and a full-day program. (DARMSTADT \u2013 RED\/PSD\/stip) Featured image: Christian Prokesch (herzig architekten), Torsten Minti (master carpenter), City Treasurer Andr\u00e9 Schellenberg, Head of School Affairs Holger Kl\u00f6tzner, Dominic Frank (Headmaster of Arheilgen District School) and Sebastian Schuster (Darmstadt Real Estate Management). Photo: City of Darmstadt \u2013 Marcus Stippak"}