ADVERTISING
Repair work will only affect motor vehicle traffic – pedestrians can pass through
Darmstadt. Following the water main break last Saturday, Schwarze Weg in Darmstadt will likely remain closed to motor vehicle traffic for another two weeks due to repair work. ENTEGA announced this on Tuesday, August 12.
The section is accessible from both sides – west and east – up to the construction site at house number 9. Pedestrian access remains open in both directions. ENTEGA requests that e-scooters not be parked in the construction area to avoid obstructing access and the work.
During the construction work, there may be temporary interruptions to the water supply. According to the company, affected residents will be informed in a timely manner.
ENTEGA publishes current information on supply disruptions and traffic disruptions via the e-netz Ticker and online at www.e-netz-suedhessen.de .
(DARMSTADT – RED/ENTEGS/blu)