Upgrading mobile network coverage with 5G leads to lane narrowing
in the Darmstadt City Tunnel from Monday, September 15th, to Friday, September 26th, 2025, between 8 pm and 5 amFurther work to upgrade mobile network coverage . The aim is to equip the tunnel with the 5G mobile standard.
will be the roadway in the tunnel. However, the entrances and exits to the parking garages will remain open without restrictions.
(DARMSTADT – RED/PSD/dk)
